A defects dispute asks three things: what is wrong, what caused it, and what it costs to put right. The first two are engineering questions for a technical expert. The third is a valuation question for a quantum expert.
Work or design that does not meet what the contract required: the drawings, the specification and the standards the contract calls up. Whether a party is liable for it is a legal question for the tribunal. The experts establish the facts the answer rests on.
Some defects are structural: they affect the strength or stability of the building, as with cracking, excessive deflection or a failure of post-tensioning. Others affect the finishes, the waterproofing or the building services.
A technical expert gives the tribunal an independent opinion on the engineering questions. Did the design do what the contract required of it? Was the work built to the drawings and the specification? What caused the defect or the failure? What is needed to put it right?
The drawings and calculations show what was designed. The site records, tests and inspection show what was built. Where the evidence does not allow design and workmanship to be told apart, the report says so.
The quantum expert values the repair the technical expert describes, and the counterclaims that usually come with a defects case: the cost of rectification already carried out, work not to specification, and sums withheld. Where the repair has been done, the valuation works from the actual cost records. Where it has not, it works from a priced scope.
Defects evidence is physical. Once remedial work starts, the defect as it was found is gone. An inspection, a full record of the condition of the works and any sampling or testing are best done before repair begins, with the other party given the chance to attend.
Technical expert
Post-tensioning
Expert evidence
Quantum expert
Contract balance, retention, additional man-hours, performance bonds, liquidated damages, non-compliant work, defects
Expert report
Technical expert witness
Technical issues
Expert evidence
Work or design that does not meet what the contract required, measured against the drawings, the specification and the standards the contract calls up.
Often, yes. The drawings and calculations show what was designed, and the site records, tests and inspection show what was built. Where the evidence does not allow the two to be told apart, the report says so.
Usually a technical expert on the cause and the repair, and a quantum expert on what the repair is worth. If the defect also delayed completion, a delay expert deals with its effect on the completion date.
From the actual cost records where the repair has been carried out, and from a priced scope of the repair the technical expert describes where it has not. The valuation follows what the contract and the governing law allow, which is a matter for the lawyers.
A defect that affects the strength or stability of a building or structure, as opposed to its finishes or its services. Whether a defect is structural is an engineering question for a technical expert.
A rule in the civil codes of several Gulf states, including the UAE, Qatar and Oman, under which the contractor and the designer are liable for ten years for the collapse of a building and for defects that threaten its stability or safety. Whether it applies to a project is a legal question for the parties’ lawyers.
Yes, including in a DIAC arbitration on high-rise towers in Dubai, in arbitration in the DIFC and in four arbitrations on works in Qatar.
Michael RoosFounding Partner, Testifying Quantum Expert
+971 (0)55 869 5337Jamie ShaftoFounding Partner, Testifying Delay Expert
+971 (0)58 569 3416Stephen M JohnPartner, Testifying Technical Expert
+44 (0)7891 784 891Michael WhitingPartner, Quantum Expert
+44 (0)7762 124 220