Forensic delay analysis looks back at a project to establish what delayed completion and by how long. It is the evidence that an extension of time claim, a claim for prolongation costs or a defence to delay damages rests on.
During a project, a planner looks forward: what will this event do to the completion date? In a dispute, the delay analyst looks back: what did delay completion, and by how many days? The analysis is built from the programmes and the progress records the project produced at the time.
The work turns on the critical path, the chain of activities that fixes the completion date at any point in the job. Only delay on that path delays completion. The critical path can move as the job goes on, so the analysis has to follow it through the works and not assume that it stayed where the first programme put it.
The Society of Construction Law Delay and Disruption Protocol (2nd edition, February 2017) describes six methods of delay analysis in common use.
Some of these start from an event and model its effect. Others start from the delay that occurred and look for its cause. Each has limits, and each needs different records.
The Protocol is published guidance, not a contract document and not a statement of the law. It was written with English law in mind and gives way to the contract and the governing law. Where this page says what the Protocol recommends, that is a summary of the Protocol, not an opinion on any dispute.
For an analysis carried out after the event, the second edition of the Protocol does not prefer one method over the others. It lists the matters that should decide the choice:
Whatever the method, the Protocol says the result has to make sense when it is set against what happened on site. A report should say which method was used, why, and what its limits are.
The records decide which methods are open. It is better to know that before a delay case is committed to paper, which is why a delay expert is best appointed early.
A written report that sets out the instructions, the programmes and documents relied on, the method and the reasons for it, the critical path through the job, the delay found in each period, and every assumption and gap in the records. Whether an event entitles a party to time or money under the contract is for the tribunal. More on the role is on our delay expert witness page.
Delay expert
Responsibility for delay
Expert reports, joint statements; oral evidence under cross-examination by King’s Counsel
Delay expert
Responsibility for delay
Expert reports, joint statements; oral evidence under cross-examination
Delay expert
Responsibility for delay
Expert reports, joint statements; oral evidence under cross-examination
Delay expert
Responsibility for delay
Independent delay analysis and expert reports
An analysis, carried out after the event, of what delayed completion of a construction project and by how long. It is built from the programmes and progress records the project produced and is used as evidence in claims and disputes about time.
The Society of Construction Law Delay and Disruption Protocol describes six in common use: impacted as-planned, time impact analysis, time slice windows, as-planned versus as-built windows, retrospective longest path and collapsed as-built.
No method is right for every dispute. For analysis after the event, the second edition of the Protocol does not prefer one. The choice depends on the contract, the events, the records and programmes available, the time available, the forum and what is proportionate.
Guidance on delay and disruption published by the Society of Construction Law. The second edition was published in February 2017. It is not a contract document or a statement of the law, and it gives way to the contract and the governing law.
Sometimes. The Protocol describes methods that rely less on the baseline programme and on software, and recognises that the critical path can on occasion be established from a practical analysis of the facts or from production and resource data. What can be done depends on the records.
Jamie Shafto, founding partner and testifying delay expert. He has been appointed in ICC and DIAC arbitrations and has given oral evidence under cross-examination by King’s Counsel.
Michael RoosFounding Partner, Testifying Quantum Expert
+971 (0)55 869 5337Jamie ShaftoFounding Partner, Testifying Delay Expert
+971 (0)58 569 3416Stephen M JohnPartner, Testifying Technical Expert
+44 (0)7891 784 891Michael WhitingPartner, Quantum Expert
+44 (0)7762 124 220